Tuesday, 4 March 2014

Electrics and roller door

It's getting to the point where once the floor is in, parts of the house would be completed. All the plugs, switches, lights and smoke detectors went in today.





We chose to go with the standard lights rather then down lights due to their cost as an upgrade. We will most likey have our own electrician some time in the near future do the main rooms, then installation to the rest of the house will have to be at a later date. 

It was also nice to see the roller door on. I think that pretty much completes what the front exterior if the house will be like... Minus that horrid outdoor loo that's still in the front. 




The flooring is supposed to start tomorrow if it is still on schedule. We've got floating floors through the front entrance, hallway, kitchen, dining and family room, and carpets throughout the rest. I'm a bit worried I'm not going to like to colour of the floor. I guess we'll soon find out. 

No comments:

Post a Comment