Sunday 2 June 2013

Deposit Down, Pre-lim Quotes Signed

We've met with Mr K and signed the quotes and basic documents.  Put down the a deposit and now have to wait for the Soil Test, then move onto the design of the slab, and then the first official draft of The Contracts for The Memphis.

We've been told about 4 - 5 weeks or so.  I know there's all sorts of delays but we'll see.  Now it's the waiting game. Things are getting exciting... but at the same time I'm really starting to stress.  I know of all the issues that go hand in hand with building so I am dreading, and expecting the worse.

Fingers Crossed!