Monday 3 March 2014

Plumbing

Most of the plumbing was done today. I couldn't get photos of the bathtub, shower screens and toilets but was able to make them out (albeit extremely blurry) by looking through the frosted bathroom windows. However, I was able to get some shots of the Tap fittings through the normal windows.





All our down pipes have also been installed. 



Our site supervisor also called to let us know the garage roller door will go in tomorrow as well as the electrics. Then followed by the flooring this week too. Going to be a busy week that's for sure. 

1 comment:

  1. Wow! The fittings and tap fixtures look amazing. I love how from the plumbing, one can tell the post-modern aesthetic and vibe of the house. Kudos to you and the guys who did the wonderful job! I hope you guys are settling in nicely. Thanks for sharing!

    Peter Wilson @ Rumpca Services, Inc.

    ReplyDelete